A stackedcalendar is a resource-scheduling calendar view — distinct from the simpler calendar control documented in Data Views. It stacks per-day information (notes/attendance/reports/progress) across a week, week-start/length and minute-increment settings, and several day-level sub-blocks. This whole family (11 constructs) had zero prior vault coverage.
Per-day data for the stacked calendar — date, duration, wage/job-remaining figures, status list, and the commands available on a given day.
cardindication
“Indicator of notes/more information on a day.” cardindication { <EmphasisSetting>+ } — nests inside daysinfo.
indication
“Corner indication for items in stacked calendar.” indication { <EmphasisSetting>+ } — same shape as cardindication, but also valid inside reports/attendance content (not just daysinfo).
statuses
statuses { status = <Value>; ... } — the list of status values shown for the day. No further description from Marble.
reports for <Datasource> url=... { -- ReportsContent: can include indication, editduration command, etc.}
No further description from Marble beyond the header shape — its content block (ReportsContent) is shared with attendance’s content (both can host indication and editduration command).
attendance
attendance for <Datasource> url=... { -- AttendanceContent: can include indication, editduration command, etc.}
Same situation as reports — minimal header description, shared content shape (AttendanceContent).
progressarea
progressarea for <Datasource> url=... { label = "<Value>"; controlling = <Value>; value = <Value>; -- value repeats, one or more}
No further description from Marble. By field shape, this renders a progress bar/area driven by one or more value settings against a controlling reference.
Day-Level Flags on stackedcalendar
Flag
Purpose (inferred from name, no Marble description)
showwageattendance
Show/hide the wage-attendance figure.
showdailystatus
Show/hide the daily status indicator.
showinfoattendance
Show/hide the info-attendance indicator.
showweeklyprogress
Show/hide the weekly progress summary.
showweeknumber
Show/hide the ISO week number.
See Also
Data Views — the simpler calendar/ganttchart/yearview controls